We have a template called AnalogPVAsset with an analysis called BadValues (see attachment level 1).
Derived from that template we have a template AnalogPVSTSEuLoHiAsset where we have overridden the BadValues analysis (see attachment level 2). The...
It's sometimes very important to wait the end of a backfilling operation before ask for another backfilling operation.
That's why, it should be convenient to filter the analysis list to point out the analysis still in progress.
I would like to suggest a richer escalation model. It should be possible to trigger escalation from process events as well as based on time. It should be possible to trigger escalation even if an event frame has been acknowledged. The escalation s...
Customer would like a specific Notification to use a 24 hour time format, while all other Notifications use the 12 hour time format.
For Example: Notifications A sends out emails in a 24 hour time format. All other notifications sends out emails ...
As shown on the screenshot, a notification created will only reference an element which is created on.
It would be more flexible if we are able to reference two or more elements at the same time.
For example, as in the following setup :
--Parent
...
Recover data from the current time back rather than start of a data gap to now (current time). The most important thing is to get current data immediately.
Implement all the default calculations existing in EXCEL.
We need to calculate the IRR (internal rate of return) for every technology: Inside the PI Analysis is not already available the function to calculate the IRR (like for the vb.net, Excel, ...