Skip to Main Content
AVEVA Product Feedback


ADD A NEW IDEA

All ideas

Showing 830

Restore Write access to Module Dabase after uninstalling AF link

MDB to AF synchronisation is not needed anymore and new installation of data archive are free to not install it. Existing installations must maintain this link in order to allow PI-ACE to function properly and add new context. PI-ACE cannot be rep...
Guest over 2 years ago in Data Archive 0 No status

Bring "old" data archive into ultra fast and seamless database system

Please do away with archaic pi archive file system with non-seamless begin/end dates to sql that runs on a ultra-powerhouse database server capturing always available, never-ending data.
Guest over 2 years ago in Data Archive 0 No status

Enable PI World Trust without Windows Security

The recent PI DA does not allow PI World user access to PI DA other than windows security. Windows Security requires SPN registration which is somehow hard to execute in right manner. I suggest to implement either function. 1: Enable PI DA to al...
Guest over 2 years ago in Data Archive 0 No status

Permit me to keep "no data" and also use tag with AF Analytics

I'd like a way that permits me to use AF analytics on "no-data" pi points without requiring me to strip/remove all no-data points, so that I can also use "no-data" for notifications.
Guest over 2 years ago in Analytics & Calculations 0 No status

Button for unchecking all Trigger On attributes when setting up an analysis

When setting up an Analysis in Pi System Explorer as Event Triggered, all attributes will by default be chosen as Trigger on. Normally, I would only like the analysis to trigger on one input, if there are many attributes deselecting all is time c...
Guest over 2 years ago in Analytics & Calculations 0 No status

Automatic recalculation on template based analysis without automatic recalculation

It should be possible to check "Recalculate analysis for out-of-order input events" if the analysis is based on a template and the re-calculation is not checked in the template. A change of the output time stamps is already possible.
Guest over 2 years ago in Analytics & Calculations 0 No status

Trigger analysis on events since time creation of new version AF element.

Situation: Attribute of an AF element is one of the triggers for Event Frame analysis for sending critial Notifications. Currently: After creating a new version of an AF Element and setting a new value for the attribute the changed value will poss...
Guest over 2 years ago in Analytics & Calculations 0 No status

Increase the discoverability of the windows that are accessible by right-clicking on the Operations pane

In PI System Explorer → Management, with the Analysis radio button selected, right-clicking in the Operations pane gives the user access to additional windows. Even though this is documented, it is not very discoverable. Users do not expect right-...
Guest over 2 years ago in Analytics & Calculations 2 No status

close/open event frames based on events, not transitions

I use analysis to toggle a boolean or integer from 0 to 1. This is used as source to close/open event frames (step continious mode). this is working fine in real-time. But when I do a recalculation for a part of time in the past (not until *) on t...
Guest over 2 years ago in Analytics & Calculations 1 No status

split analysis is real-time and recalculation part (different logic to be used)

It would be nice if we could have a "real-time" and "recalculate" part in an analysis. As source data could have changed you probably want sometimes the analysis to act in another way. Example: 2 attributes are used to trigger an event-triggered a...
Guest over 2 years ago in Analytics & Calculations 2 No status