As a process engineer I would like to be able to integrate complex specific calculations, such as from a 3rd party analytics engine, so that I can use the Asset Analytics and its context with all the available data and scheduling to run those with...
As a user of event frames, I would like the ability to be able to set a time true condition for the end trigger of an event frame analysis, similar to how this functionality is available for the start trigger
Automatic Recalculation of Event Frame in PI Analysis
As a user, I would like to have the option to automatic recalculation of event frame for out-of-order input events in AF analysis. The option is available for expression analysis in PI Analysis 2017 R2 but not for event frame generation anal...
As a user configuring a Rollup analysis, I want to be able to apply a filter expression on the inputs so that the Rollup only includes inputs that satisfy a condition.
Note: This was previously Enhancement 114349.
Add Function to Determine if a Bit is Active in a Word Value
It would be extremely helpful if a function existed within PI AF where could provided a value/tag reference and a bit number to check and see if its active. The function would return a True or False value if that bit is active. Something like the ...
Referencing attributes on other Elements for PI Notifications 2016 Message
Request : Being able to show Attribute values from other Elements other than the attributes on the Referenced Element for the Message in Notification 2016.
Description : From the old version, it was possible for a notification message to display ...
Guest
about 3 years ago
in Notifications
9
No status
Managing thousands of notifications can be difficult. There should be an option to export all the notifications and its subscribers. In PI Builder, you can find information about notifications via Contacts and Elements. There should be a direct wa...
Guest
about 3 years ago
in Notifications
10
No status
Support Analysis Data Reference Step Functionality
Use case: User wants to trend Analysis Data Reference in client tools (Processbook, Coresight). User doesn’t want to create a PI tag for this output. Currently, the AnalysisDR ignores step, even if it’s input attributes are step.
Be able to disable auto backfilling on a per analysis basis
Currently in the analysis service configuration there is a parameter called “AutoBackfillingEnabled” which affects the analysis calculations in a global basis. It would be great if it were possible to disable the auto backfilling to individual cal...
It would be great to have an option to backfill/recalculate Event Frame analysis without sending notificaiton.
I know, that notifications are not sent for event frames older than 72 hours, but that 3 days is still too long.
Usually we just want to recalculate Event Frames to have a proper statistic about the past in reports. The notification is use...
Guest
about 3 years ago
in Notifications
10
No status