Skip to Main Content
AVEVA Product Feedback


ADD A NEW IDEA

All ideas

Showing 829

Allow substitution parameters in attribute template description

As a user, I want to be able to use substitution parameters in attribute template descriptions, so that when elements are created from template, the attribute template description can be substituted with pertinent information. Note: This was prev...
Guest over 2 years ago in Asset Framework (AF) 7 No status

Highlight attributes not matching template

PI System Explorer should visually highlight attributes of template based elements that have changes to the template.
Guest over 2 years ago in Asset Framework (AF) 13 No status

Support import/export of AF tables in PI Builder

As a user, I want to be able to import/export AF tables using PI Builder, so that I can make changes as needed.
Guest over 2 years ago in PI Builder 5 No status

Copy paste issue for child attributes

On PI System explorer when you copy an attribute with child attributes, only the first child attribute get's copied as well and the rest is missing. This was working with PI System Explorer 2016 R2 SP1 whereas it does not with Version 2018 SP3 pat...
Guest 5 months ago in Asset Framework (AF) 0 No status

Add IsExcluded('attribute') function to AF Analysis.

Add new isexcluded(attribute_reference) function to be able to easier distinguish between Tag/Attribute errors and excluded attributes. Currently it is quite tricky to filter if an attribute is in error due to data source error or an excluded tag....
Guest 5 months ago in Asset Framework (AF) 0 No status

It would be great to have an option to backfill/recalculate Event Frame analysis without sending notificaiton.

I know, that notifications are not sent for event frames older than 72 hours, but that 3 days is still too long. Usually we just want to recalculate  Event Frames to have a proper statistic about the past in reports. The notification is use...
Guest over 2 years ago in Notifications 8 No status

Trigger AF Analysis Using Future Data

As an engineer, I want to execute analyses when I get a new future data value, so that any forecasts (either via Analysis or via a 3rd party system or via a PI Point update) can trigger analyses.
Guest over 2 years ago in Analytics & Calculations 12 No status

AVEVA Identity Manager should be able to start after PI Data Archive

Currently AIM needs to start before PI DA so it can authenticate OIDC.
Guest 2 months ago in Security 0 No status

Periodic trigger monthly and yearly

I would like to have monthly and yearly periodic trigger for Analysis-Expression and Event Frame Generation. Currently I have to use the daily trigger and check in the analysis if the month or the year changed. In case of “false” there is no outpu...
Guest over 2 years ago in Analytics & Calculations 8 No status

Variable True For parameter for Event Frame Analyses

As an AF Administrator, I want to configure an Analysis Template for Event Frames with a True For parameter that would have it's value stored in an AF Attribute (configuration item). The use case is that elements built from the template will have ...
Guest over 2 years ago in Analytics & Calculations 2 No status